Llanishen Fach Primary School required extensive renovations over the summer holidays, therefore Clockwork were instructed to complete the works within a specific timeframe.
- A knock through downstairs to open up to allow for a more spacious classroom. This required structural calculations and steels being put in place.
- New carpet tiles, that are enduring and long-lasting.
- New hygiene boards – ongoing contract.
- Extensive decoration works
All the above work was completed within the given time-frame, the larger, spacious classrooms provide a more effective and comfortable learning space for both staff and pupils, as well as general maintenance throughout the school gives the impression of a well-maintained school. Clockwork completed this to such a high standard that we were offered an ongoing contract for maintenance works at the school.